Lead Times: Production Planning for Large Orders
Baklava Academy • Article 30 • Updated guide for importers, retailers, and hospitality brands.
Key takeaways
- Lead time is a chain: specs → packaging → inputs → production slot → QA release → pickup → shipping.
- Large orders need milestones (not one promised date).
- Buffers protect promotions: plan for variability in packaging, approvals, and transport.
1) Think in milestones (PO → ship), not a single date
A realistic plan breaks the order into a few “gates” that must clear before the next step:
- Gate A — Specs locked: product mix, size/cut, net weights, piece counts, allergens, storage, shelf life.
- Gate B — Packaging/labels ready: stock packaging vs. private label; artwork + translations approved.
- Gate C — Inputs reserved: pistachio grade allocation, butter/fat supply, phyllo, cartons, films.
- Gate D — Production slot: confirmed production window and daily capacity plan.
- Gate E — QA release: lot coding verified, final checks complete, documentation pack ready.
- Gate F — Pickup/booking: palletization done, pickup scheduled, freight space confirmed (air/sea).
2) What usually extends lead times
If you manage these early, timelines become predictable.
- Private label packaging: artwork revisions, compliance changes, printing lead times.
- Ingredient constraints: premium pistachio grades and butter/fat profiles may be allocated.
- Seasonal demand: capacity fills up before peak windows (holiday spikes).
- Mixed assortments: more SKUs means more changeovers, more QC checks, and more packing complexity.
- Export documentation: label packs, batch/lot records, and any customer-specific paperwork.
3) A practical lead-time model for large orders
For planning, use a simple structure: Total lead time = (packaging/approval time) + (input readiness) + (production window) + (QA hold) + (dispatch buffer).
- Packaging/approval: fastest with stock packaging; longer with private label or new formats.
- Input readiness: reserve premium inputs early to avoid substitutions or delays.
- Production window: depends on volume, SKU count, and line changeovers.
- QA hold: time for final checks + labeling/lot verification before release.
- Dispatch buffer: staging, pallet wrap, pickup scheduling, and booking confirmation.
4) How importers can speed things up (without quality risk)
- Lock specs early: fewer last-minute changes equals fewer delays.
- Use proven formats: existing SKUs and packaging reduce setup and approval time.
- Approve substitutions rules: define what can and cannot be substituted (e.g., pistachio grade, butter type).
- Keep SKU count reasonable: large volume across fewer SKUs is faster than many small SKUs.
- Request a milestone plan: ask for a short timeline with gate dates and dependencies.
5) Recommended buffers (to protect your launch date)
Promotions, retail resets, and seasonal campaigns should never rely on “best case” production. Protect your schedule with buffers between:
- Target arrival → campaign start: to absorb customs delays, warehouse intake, and distribution.
- Packaging approval → production: to absorb printing or final compliance edits.
- Production end → pickup: to absorb QA holds and pallet staging.
If the arrival date is non-negotiable, plan backward and secure the production slot first—then align packaging and inputs to that slot.
Large-order planning checklist
- Confirm product mix and net weights; lock allergens and labeling format.
- Decide: stock packaging vs private label (and finalize artwork early if private label).
- Reserve premium inputs (pistachio grade, butter/fat) for the planned production window.
- Confirm production slot + daily output plan; minimize SKUs if timeline is tight.
- Agree on QA release requirements (lot coding, checks, documentation pack).
- Book logistics with buffer (pickup date, ETD/ETA expectations, route constraints).